Environmental Remediation Drilling
Safety Guideline
Page 100 of 132
5.10.1 - Potential Hazards of Well Development
• Pinch points
• Tool lengths
• Moving cables
• Contaminated fluids
• Acids and polyphosphates
• Electricity
• Noise
• Pressurized lines
5.11 - Surface Completion
Prior to well surface completion the following should be considered:
• Type of completion - flush mount, above grade, locking
• Bollard location and clearances
5.11.1 - Potential Hazards of Surface Completion:
• Traffic control
• Mixing concrete
• Heavy vaults and boxes
• Striking underground utilities
• Vault settlement - trip hazard, surface water intrusion
5.12 - Abandoning Wells
Prior to well abandonment the following should be considered:
• Rig mobilization and rig up - from Section 4 – Drilling Operations
• Method
o Over drill
o Abandon in place
5.12.1 - Potential Hazards of Over Drill
• All previous sections of the guideline apply.